Joint EPC · Taiwan
Municipal waste-to-energy plant
- 2 MW
- Power
- 4,000 MWh/yr
- Annual output
- Pre-sorted municipal waste
- Fuel
- Municipal waste operator
- Customer
- COD 2027
- Under construction
01
02
03
04
05
Project overview
2 MW of onsite power from pre-sorted municipal waste.
A 2 MW plant converting pre-sorted municipal waste into electricity, reducing the volume sent to landfill.
- The challenge
- A municipal waste stream with rising disposal costs and limited landfill capacity.
- What CNP delivers
- A 2 MW plant converting pre-sorted municipal waste into electricity, reducing the volume sent to landfill.

On site
Project photos.
01 / 04Impact
- 4,000 MWh
- Renewable electricity a year
- 2,000 tCO₂
- Emissions avoided a year
- 300 t
- Biochar produced a year
- 690 tCO₂e
- Carbon removal a year
Plant configuration
The plant.
- CNP role
- Joint EPC
- Capacity
- 2 MW
- Heat
- 0.7 MWth recovered
- Fuel
- Pre-sorted municipal waste
- Fuel use
- 5,000 t/yr
- Operating hours
- 8,000 h/yr
- Availability
- Target 90%
- Location
- Taiwan
- Commissioning
- 2027
Scope
What CNP delivered.
- Engineering and design
- Plant supply
- Installation and commissioning
Municipal waste operator
Customer
“The plant runs around the clock on fuel we used to pay to get rid of. Our energy costs are lower and far more predictable than before.”