Joint EPC · Croatia
Wood chip and energy grass power plant
- 6 MW
- Power
- 48,000 MWh/yr
- Annual output
- Wood chip and Napier grass
- Fuel
- Grid-connected power producer
- Customer
- Since 2020
- Operating
01
02
03
04
05
Project overview
6 MW of onsite power from wood chip and napier grass.
A 6 MW plant converting wood chip and Napier (elephant) grass into renewable electricity around the clock, exported under a long-term offtake.
- The challenge
- A region with large volumes of wood chip and crop residues, and limited productive use for them.
- What CNP delivers
- A 6 MW plant converting residues into renewable electricity around the clock, exported under a long-term offtake.

On site
Project photos.
01 / 06Impact
- 48,000 MWh
- Renewable electricity a year
- 14,000 tCO₂
- Emissions avoided a year
- 7,200 t
- Biochar produced a year
- 16,600 tCO₂e
- Carbon removal a year
Plant configuration
The plant.
- CNP role
- Joint EPC
- Capacity
- 6 MW
- Heat
- Used for fuel drying
- Fuel
- Wood chip and Napier grass
- Fuel use
- 120,000 t/yr
- Operating hours
- 8,000 h/yr
- Availability
- 95%
- Location
- Croatia
- In operation since
- 2020
Scope
What CNP delivered.
- Engineering and design
- Plant supply and fabrication
- Installation and commissioning
- Performance testing
- Operator training
Grid-connected power producer
Customer
Projects