CNP-owned (self-build IPP) · Darwin, Australia

Green waste to power and carbon removal

01

2 MW
Power

02

16,000 MWh/yr
Annual output

03

Green waste
Fuel

04

Owned and operated by CNP
Customer

05

COD 2027
Under construction

Project overview

2 MW of onsite power from green waste.

The first of several plants planned for Darwin, turning green waste into electricity and carbon removal as power prices rise.

The challenge
The Darwin region saw a fixed 20% electricity price increase in 2026, while the Darwin landfill is nearing end of life with under-utilised green waste.
What CNP delivers
A CNP-owned 2 MW plant turning local green waste — previously sent to landfill — into electricity and carbon credits. The first of several plants planned for Darwin to tackle green waste and rising energy prices.
Green waste to power and carbon removal, photo 2

On site

Project photos.

Green waste to power and carbon removal, photo 1
01 / 06

Impact

16,000 MWh
Renewable electricity a year
12,400 tCO₂
Emissions avoided a year
4,000 t
Biochar produced a year
9,000 tCO₂e
Carbon removal a year

Plant configuration

The plant.

CNP role
CNP-owned (self-build IPP)
Capacity
2 MW
Fuel
Green waste
Fuel use
20,000 t/yr
Operating hours
8,000 h/yr
Availability
Target 96%
Location
Darwin, Australia
Commissioning
2027

Scope

What CNP delivered.

  • Project development and financing
  • Engineering and design
  • Plant supply and fabrication
  • Construction and commissioning
  • Ownership and operation
  • Carbon credit generation
Carbon Negative Power

Customer

Owned and operated by CNP

“A much-needed solution to green waste and rising energy prices in Australia.”
Cameron Bell · Project Director, Carbon Negative Power