Joint EPC · Bulgaria
Agricultural residue power plant
- 5 MW
- Power
- 35,000 MWh/yr
- Annual output
- Blended agricultural residues
- Fuel
- Grid-connected power producer
- Customer
- Since 2022
- Operating
01
02
03
04
05
Project overview
5 MW of onsite power from blended agricultural residues.
A 5 MW plant running on blended agricultural residues, with fuel storage sized to carry supply between harvests.
- The challenge
- An agricultural region with seasonal residue surpluses and demand for firm renewable generation.
- What CNP delivers
- A 5 MW plant running on blended agricultural residues, with fuel storage sized to carry supply between harvests.

On site
Project photos.
01 / 13Impact
- 35,000 MWh
- Renewable electricity a year
- 15,800 tCO₂
- Emissions avoided a year
- 4,900 t
- Biochar produced a year
- 4,400 tCO₂e
- Carbon removal a year
Plant configuration
The plant.
- CNP role
- Joint EPC
- Capacity
- 5 MW
- Heat
- Used for fuel drying
- Fuel
- Blended agricultural residues
- Fuel use
- 90,000 t/yr
- Operating hours
- 8,000 h/yr
- Availability
- 92%
- Location
- Bulgaria
- In operation since
- 2022
Scope
What CNP delivered.
- Engineering and design
- Plant supply and fabrication
- Fuel handling system
- Installation and commissioning
- Operator training
Grid-connected power producer
Customer
Name withheld at the customer’s request