Carbon Negative Power
Power and process heat for a mine site, photo 1

CNP-owned (self-build IPP) · Malaysia

Power and process heat for a mine site

01

4 MW
Power

02

32,000 MWh/yr
Annual output

03

Plantation wood waste, EFB and local biomass
Fuel

04

Mine site
Customer

05

COD 2028
In development

Project overview

4 MW of onsite power from plantation wood waste, efb and local biomass.

A behind-the-meter plant supplying about 4 MW of electricity and 6 MW of process heat under a long-term energy agreement.

The challenge
An energy-intensive mine site seeking energy savings and supply security from the grid.
What CNP delivers
A behind-the-meter CNP plant supplying about 4 MW of electricity and 6 MW of process heat under a long-term energy agreement, fuelled by plantation wood and local biomass.
Power and process heat for a mine site, photo 1

Impact

32,000 MWh
Renewable electricity a year
22,400 tCO₂
Emissions avoided a year
2,400 t
Biochar produced a year
5,500 tCO₂e
Carbon removal a year

Plant configuration

The plant.

CNP role
CNP-owned (self-build IPP)
Capacity
4 MW
Heat
6 MW process heat
Fuel
Plantation wood waste, EFB and local biomass
Fuel use
40,000 t/yr
Operating hours
8,000 h/yr
Availability
Target 92%
Location
Malaysia
Commissioning
2028

Scope

What CNP delivered.

  • Project development and financing
  • Engineering and design
  • Plant supply and fabrication
  • Installation and commissioning
  • Operations and maintenance
  • Biochar and carbon removal
Mine site

Customer

Name withheld at the customer’s request

“As a mine, we do not want to be in the energy generation business. CNP offered us a private onsite power plant at our site — funded, built and run by them.”
Operations, mine site

Projects

More projects.

See if onsite energy works for your site.